In 2010, the Cradle Coast Authority (CCA) secured funding from the State Government’s Trails and Bikeways Program to prepare a master plan to guide the construction of approximately 85km of continuous linear shared / cycling pathway which connects coastal-zone communities from Wynyard in the west to Latrobe in the east.

It also includes around 24km of additional connecting links (a total of approximately 110km).

The Plan was developed to inform each Council’s own local shared pathway planning and related funding applications.

The Pathway is being constructed in stages, with approximately 35kms (30%) complete.

A Project Control Group (PCG) was established to focus on identifying the status of incomplete sections, with the aim of getting these sections development ready while funding was being secured.

Government funding provided in 2019 has allowed the project to proceed with planning, detailed design and construction of the pathway.

Cradle Coast Authority (CCA) will coordinate the tender process and appoint all consultants/contractors for the duration of the project.

There are three sections of pathway which are to be completed prior to June 2022. Each of the sections are at different stages of development and so require varying amounts of work in order to get all three sections to a point where construction can proceed.

Tenders are invited for the following contract:

  • Development Application 
  • Detailed Design of the Coastal Pathway

Tender documents can be downloaded below:

Tender submissions will be received up until 5pm, Thursday, 30 May, 2019

Enquiries can be made to Mary Roddy: phone 0416 523 079